Details

Primary School Mönichwald

1358238839id-4405_20101222_093428-9a1a4713.jpg

The company of Hutter acustix was responsible for all the acoustics calculation and planning at the construction site of the primary school VS Mönichwald. Due to cutting edge calculation methods and implementation of Hutter acustix own sound control system, rooms were created which are a benchmark for acoustics in school projects.

As a result of the optimum acoustic and ergonomic room characteristics an increase in concentration was observed after only a few days, as well as a noticeable reduction of aggression amongst the pupils.

The project was carried out by Möbelwerkstätte Hutter using pine from the region which was procured by Arge TANNO and especially processed into the solid boards required for the project.

TANNO – Innovations in Pine!
More information: http://www.tanno.at
Architecture firm DREIPLUS - DI Thomas Heil
Photographer: Günter Kresser