History

History

1948 - Founded in Birkfeld by Adolf Hutter sen.
1949 - Construction of the workshop in Weizerstraße, which over the years has seen continual expansion.
1968 - Adolf Hutter jun. entered the company.
1981 - Death of the company founder Adolf Hutter sen.
1992 - After graduation from the Higher Technical College in Mödling, Armin Hutter began his studies in architecture at the Technical University of Vienna.
1993 - Armin Hutter looks for his personal niche (Hifi Furniture) within the company.
1999 - 50 Year Anniversary
2001 - Armin Hutter completes his studies in architecture.
2002 - Development of the acoustics system "selective sound control"
2003-2005 - Reconstruction and expansion of the production and planning department.
2004 - Production of the complete audio loudspeaker range of the reputed piano-makers Bösendorfer at Hutter (incl. highly polished surfaces).
2007 - Realization of the 50th acoustics room which is equipped with "selective sound control".
2007 - Start of a research project with the world's biggest producer of paper machines Voith Paper.
2007 - The first big function room is equipped with "selective sound control" in Wildermieming/Tyrol.
2009 - Development of the "Sound Optimizer" for subsequent acoustical improvement of existing rooms.
2009 - Completion of the two biggest projects in our company's history: Primary school Mönichwald and "Haus Flachau" (Flachau/Styria). Both are acoustic projects.
2010 - Realization of the 100th acoustics room equipped with "selective sound control".
2012 - First contact with operators of Russian concert halls.
2012 - Opening of the in-house carbaret/small arts theatre in the center of Birkfeld.
2013 - Realization of the 150th acoustic room equipped with "selective sound control".
2013 - First planning contract for the acoustic restoration of the concert hall of the Philharmonics Rjasan/Russia.
2013 - Opening of the acoustic exhibition "Klangtunnel" in Birkfeld.
2013 - 2014 Erste Bank Campus Vienna - Development and manufacture of space acoustically effective facade elements.
2014 - Completition of a developement partnership with Siemens - Transformers Weiz.
2015 - TU Graz planning and development of a case study area according to Harvard method.
2015 - Erste Bank Campus Vienna - acoustic development of the entire interior acoustics.
2015 - Remodeling the entire Therme Waltersdorf Styria.
2016 - Managing Direktor DI Armin Hutter died on 28th of April 2016.