Chronology


We are proud of our history, our employees, contracts and developments. Following the founding of the joinery business HUTTER in 1948, we have constantly grown, have continued developing and have passed our know-how on from generation to generation. The company headquarters in East Styrian Birkfeld has remained the same and from this location an ever-growing numbers of benchmarks are being set in acoustics for large halls and rooms.

 

Acoustics is our Passion


We have developed into specialists for hall and room acoustics with our selective sound guidance.

We provide an overall concept with our company’s internal acoustic calculations as well optical & structural technology designs. Our highly qualified specialist employees provide a smooth progression from manufacture through to installation, all under the one roof. Rehearsal rooms, concert halls, multi-purpose halls, hotel and wellness areas, schools and kindergartens, through to private areas – every room receives its own acoustic tailor-made, customised solution.

Company history in Overview


From 1948 to 1999

1948 founded in in Birkfeld by Adolf Hutter Senior.
1949 Construction of the workshop in Weizerstraße, which was continuously enlarged over the years.
1968 Adolf Hutter Junior started working for the company.
1981 Death of the of the company’s founder Adolf Hutter Senior.
1983 Development and sales of the Art Nouveau furniture series "SIGN'E".
1993DI Armin Hutter now in the third generation found his own niche with HIFI furniture.
1999 The company’s 50th anniversary.


From 2001 to 2014

2002 Development of the „selective sound guidance“ acoustic system.
2004 Manufacture of the entire Audio series of loudspeakers for the renowned piano manufacturer Bösendorfer (incl. high-gloss surfaces).
2007The 50th acoustic room with the system of „selective sound guidance“ was realised. Start of a research project with the world’s largest paper machine manufacturer Voith Paper. The first large performance venue in Wildermieming, Tyrol is fitted with the selective noise guidance system.
2009 Development of the „Sound Optimizer“ for subsequent improvement of acoustics in existing rooms.
2009 Manufacture of the two largest projects in the company’s history until now the school Volksschule Mönichwald, and the building Haus Flachau (both are acoustic projects).
2010 The 100th acoustic room was realized with the „selective sound guidance“.
2012 The first contacts for projects to concert hall operators in Russia were secured.
2013 First planning and design contract for acoustic renovation of the concert hall for a Russian Philharmonic orchestra
2013 The Sound Tunnel exhibit opens in Birkfeld (Klangtunnel).
2013-2014 Development and manufacture of effective spatial acoustic facade elements for the Erste Bank Campus in Vienna.
2014 Concluded a development partnership with Siemens - Transformers in Weiz.


From 2015 to 2019

2015 Acoustic development, optical design and production of just the fourth location in the world of a case study room according to the Harvard method at TU Graz (Graz University of Technology).br /> 2015 Acoustic development for the entire internal acoustic space on one of the largest building sites in Austria, the Erste Bank Campus. The acoustically sensitive partial regions were implemented by HUTTER ACUSTIX.
2015 Conversion of the entire thermal swimming baths at Therme Waltersdorf Steiermark in Syria by the HUTTER ACUSTIX team.
2016 DI Armin Hutter died after a severe illness on 28. April 2016. His wife Elisabeth Hutter takes over Project Management.
2016 VS Algersdorf Grau – completion of the „Coolest School in the City“!
2017 Fitting acoustic panels to the thermal baths Therme Nova in Köflach.
2017 Acoustic optimisation of the open plan offices of the company Andritz-Hydro GmbH.
2017 Acoustic optimisation of the logistics specialists ISA-Jungheinrich.
2017 LKH Hartberg, Graz, Voitsberg & Weiz – improving the spatial acoustics in the laboratory through installing lightweight design absorbers.
2017 Completion of wall and ceiling cladding in the company Sabo + Mandl & Tomaschek Immobilien GmbH.
2018 Renovation Acquarena Brixen
2018 Complete equipment of the first "Acoustic Bar" - THE MEINZ - in Vienna.
2018 Acoustic optimization in the office of TAC Informationstechnologie GmbH.
2019 Conversion of the old Astra cinema into a modern event center in Bressanone.
2019 Rebuilding and new construction of the village hotel Faschings in Fischbach.
2019 Plant expansion and machine modernization to 4.0..

 

Advising customers in the design of their living spaces is
an opportunity to build up trust


We at HUTTER ACUSTIX are aware of this and handle such responsibility with the utmost care. We always offer our customers precise, individual designs, consultancy and fabrications customised to meet their needs for the widest sets of problems.


+43 3174 4472 | office@hutter.co.at

 
Keine Produkte im Warenkorb